GULF ISLANDS, BC: Firecast Full Repair System
REVELSTOKE, BC: Wood Floor Model
First, we removed the old black box fireplace and removed the drywall that the stone had been laid against. The metal radiation shield and wood floor kit was set in place. The back brick was lifted up and placed into the metal shroud. Thermix fill was poured into the area around the cavity between the back brick and the internal area of the metal shroud. From the inside we attached the 8” flare panels. We had to cast a header section as the actual opening was 3 in higher than the 28½” height of the firebox. The area between the unit and the facing was sealed on the outside as well the area behind the new header section. The cast pipe adapter was installed and the 8” chimney was attached and completed. The wood chase box was completed to include a metal chase cover. Firecast Wood Floor Model is tested to total zero clearance.
UL 127/ULC S610 8” inch chimney.
SALMON ARM, BC: Firecast Full Repair